0

Autosave for the Project Scheduler

My biggest challenge is the PPO Timeout, If you do not submit continuously you can lose everything and sometimes 10s or 100s of lines when you step away from your pc/laptop or get distracted or taken away from your work for a few minutes too long. Can a autosave or caching function be added to prevent the loss of information if not saved?

1 comment

Please sign in to leave a comment.