Currently in PPO once you have edit rights to a project or issues etc you can do this on all projects. There is a requirement to have read and write on a project level and not a system wide functional level. Thus on this project (based on my role) I can read and here I can edit. This will have to involve some thinking around the role definition on projects and might mean bring in the "project team" concept we looked at before.